- 42,002 views • 9 today
- 8,501 downloads • 3 today
31
Almost final vesion of my project.
Additional Notes
Schematic size:w 503
l 703
h 76
| Progress | 90% complete |
| Tags |
13 Update Logs
Update #13 : by Dondor 03/12/2012 1:24:35 pmMarch 12, 2012 @ 5:24 pm UTC
1. Added roads.
2. Added buildigs.
3. Added park.
4. Added grass.
5. Added crane.
6. Added bridges.
7. Added canal.
8. Changed main pipe.
9. Updated schematic and demoworld.
2. Added buildigs.
3. Added park.
4. Added grass.
5. Added crane.
6. Added bridges.
7. Added canal.
8. Changed main pipe.
9. Updated schematic and demoworld.
LOAD MORE LOGS
61898
2






Have something to say?