27
Go to my Channel http://www.youtube.com/channel/UC7W5hGD5lCp_5fDVaSIhKwA
WTC 1: 188 meters of it is now done but it has been cut to stop glitching. (saved in mcedit)
WTC 2: 188 meters of it is now done but it has been cut to stop glitching. (saved in mcedit)
WTC 3: 5% Done
WTC 4: 0% Done
WTC 5: 1% Done
WTC 6: 1% Done
WTC 7: 0% Done
WTC 1: 188 meters of it is now done but it has been cut to stop glitching. (saved in mcedit)
WTC 2: 188 meters of it is now done but it has been cut to stop glitching. (saved in mcedit)
WTC 3: 5% Done
WTC 4: 0% Done
WTC 5: 1% Done
WTC 6: 1% Done
WTC 7: 0% Done
Credit | LP Build Team |
Progress | 10% complete |
Tags |
2780263
2
Create an account or sign in to comment.
Ask if you want a MCEdit-schematic.